She’s ready!

So my little Hyosung GV250 is looking like a big bike now.  With everything added over the past few days she is finally all ready.  As the weather warms up ill make sure to get out the zip ties to fasten all the cables and everything.  I tried doing it today but it was so cold that the zip ties would break when I bent them.  So that was no good.

 

IMG_3651

 

Also Ill want to make sure everything is tight, plus ill probably go over some of the main bolts and add lock tight to make sure everything is nice and secure.  Other then that though everything is done and functional.

Tomorrow if the weather is on my side i may go and attempt to change the oil.  I did change it just before winter, but used the cheapest oil that I could find.  I went out this week and bought some synthetic oil and am going to use that instead.  Hopefully this will make her run even better.

 

IMG_3652

 

She was running surprisingly well for her first start, as the gas has been sitting for more then 3 months, and yes there was gas stabilizer in the tank, but still.  Im sure the next tank full of gas will be even better.

Well here are two very quick videos.  One is just of the bike running and one is just a quick look of what has been installed.

Enjoy.

 

[embedplusvideo height=”480″ width=”853″ editlink=”http://bit.ly/1nqKM5o” standard=”http://www.youtube.com/v/idxNvAiWeNs?fs=1″ vars=”ytid=idxNvAiWeNs&width=853&height=480&start=&stop=&rs=w&hd=0&autoplay=0&react=1&chapters=&notes=” id=”ep7619″ /]

 

[embedplusvideo height=”480″ width=”853″ editlink=”http://bit.ly/1nqKQ4Z” standard=”http://www.youtube.com/v/mzgyOIuW7p0?fs=1″ vars=”ytid=mzgyOIuW7p0&width=853&height=480&start=&stop=&rs=w&hd=0&autoplay=0&react=1&chapters=&notes=” id=”ep2856″ /]

Leave a Reply

Your email address will not be published.

You may use these HTML tags and attributes:

<a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>